From the GTSnet toolbar select Parameters > Administration > EOD Task Status Maintenance.
On the Task Id tab select the report wanted to generate a CSV file from the dropdown.
In the Parameter 1 field change the value from N to Y.
Click Modify and Exit.
The next time the report is generated manually or at EOD it will create a CSV report.
